This article is more than 1 year old

Artemis I core stage finally pointing in the right direction at Kennedy Space Center

Had trouble getting vertical at the weekend? NASA used a pair of cranes to hoist the SLS core stage

Engineers have hoisted the core stage of NASA's mega-rocket, the Space Launch System, vertical ready to bolt on its boosters and roll the stack to the launchpad later this year.

The milestone has been a while coming in a programme beset by delays and difficulty, both engineering and financial.

The core stage arrived at Kennedy Space Center (KSC) in April following the completion of the Green Run test campaign at NASA's Stennis facility. After some stops and starts, a full duration test firing was accomplished in Stennis's B-2 test stand.

The overhead cranes in the Vehicle Assembly Building (VAB) rotated the core stage from horizontal to vertical on 11 June. The stage was then lowered onto the mobile launcher, between Artemis I's solid rocket boosters in High Bay 3 of the VAB.

The sight of actual flight hardware stacked in the VAB doubtless brought on more than a tinge of nostalgia for folk who miss the days of the Space Shuttle and its external tank being lifted and rotated in a similar way.

Once the core stage has been secured, further components will be stacked. These include the Interim Cryogenic Propulsion Stage (ICPS) and the Orion Stage Adapter. More testing will follow before the Orion spacecraft itself (and European Service Module) can be lowered onto the completed rocket.

NASA continues to work toward a launch for the monster rocket in November, which will send the uncrewed Orion spacecraft on a three-week mission around the Moon. Should all go well, a crewed mission will follow nearly two years later, in the latter part of 2023.

And if the space agency needs any further help in pointing its rockets, we'd have to recommend checking out xkcd.com and the Up Goer Five. ®

More about

TIP US OFF

Send us news


Other stories you might like